{"id":15113,"date":"2021-09-07T17:04:24","date_gmt":"2021-09-07T14:04:24","guid":{"rendered":"https:\/\/eg.mashroo3k.com\/studies\/%d8%b4%d8%b1%d9%83%d8%a9-%d9%85%d9%82%d8%a7%d9%88%d9%84%d8%a7%d8%aa\/"},"modified":"2025-05-09T23:12:43","modified_gmt":"2025-05-09T20:12:43","slug":"%d8%b4%d8%b1%d9%83%d8%a9-%d9%85%d9%82%d8%a7%d9%88%d9%84%d8%a7%d8%aa","status":"publish","type":"studies","link":"https:\/\/eg.mashroo3k.com\/en\/studies\/%d8%b4%d8%b1%d9%83%d8%a9-%d9%85%d9%82%d8%a7%d9%88%d9%84%d8%a7%d8%aa\/","title":{"rendered":"Contracting company"},"content":{"rendered":" <div class=\"content-card study-summary\">\n    <!-- Grid -->\n    <div class=\"row no-gutter\">\n        <!-- Media -->\n        <div class=\"col-12 col-m-5\">\n                    <a href=\"#\" data-title=\"Contracting company\" class=\"responsive-element media-element \" data-src=\"https:\/\/eg.mashroo3k.com\/wp-content\/uploads\/2021\/09\/3.jpeg\"><\/a>\n        <\/div>\n        <!-- Content -->\n        <div class=\"col-12 col-m-7 rich-content\">\n            <h2>Contracting company<\/h2>\n                        <p>mashroo3k Company Consulting provides a feasibility study for a contracting company project in Egypt, with the highest profit return and best payback period, through a series of precise studies on the size of the Egyptian market, analysis of local and foreign competitors&#8217; strategies, and providing competitive price offers.<\/p>\n            <p><\/p>\n        <\/div>\n        <!-- Info Bar -->\n        <div class=\"col-12 col-m-7 info-bar flexbox\">\n            <!-- Item -->\n            <h3 class=\"info-item col-auto\">Capital <strong data-counter=\"2625000\" data-sign=\" EGP\"><\/strong><\/h3>            <!-- Item -->\n            <h3 class=\"info-item col-auto\">Rate of return <strong data-counter=\"42\" data-sign=\"%\"><\/strong><\/h3>            <!-- Item -->\n                        <!-- Item -->\n                        <!-- Item -->\n                        <!-- Item -->\n            <h3 class=\"info-item col-auto\">Recovery period <strong >The second year <\/strong><\/h3>        <\/div>\n        <!-- Info Bar -->\n    <\/div>\n    <!-- \/\/ Grid -->\n<\/div>\n\n\n\n<div class=\"wp-block-tornado-components-project alignfull content-card study-subjects\"><div class=\"row row-reverse\"><div class=\"col-12 col-m-5\"><img decoding=\"async\" src=\"https:\/\/eg.mashroo3k.com\/wp-content\/uploads\/2021\/09\/3.jpeg\" alt=\"\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-7 rich-content\"><h2><\/h2><p class=\" desc1\">The project idea is based on establishing and preparing a major contracting company that offers engineering consultations and implements interior and exterior finishing services for various types and sizes of facilities. Construction and building projects in Egypt represent a promising investment future in the coming period, due to the continuous growth of the construction sector in Egypt and the rising of its developmental indicators. Your project consulting company provides interested investors with specialized feasibility studies based on updated databases specific to the Egyptian market, which helps ensure the project&#8217;s success, achieve the highest profit returns, and the best payback period. &#8230;<\/p><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-tornado-project-justifications alignfull content-card study-benifites\"><div class=\"row row-reverse\"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/eg.mashroo3k.com\/wp-content\/uploads\/2021\/09\/3.jpeg\" alt=\"Project products\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Project products<\/h2><ul class=\"chelist\"><li>Providing construction materials and finishing materials at competitive prices.<\/li><\/ul><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-tornado-project-justifications alignfull content-card study-benifites\"><div class=\"row \"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/mashroo3k.com\/newweoryx\/wp-content\/uploads\/2019\/12\/01.png\" alt=\"Why Mashroo3k ?\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Why Mashroo3k ?<\/h2><ul class=\"chelist\"><li><a href=\"https:\/\/mashroo3k.com\/\">Mashroo3k <\/a>has over 11 years of experience in preparing feasibility studies, conducting market research, and providing comprehensive consulting services.<\/li><li>Mashroo3k has offices in 7 international branches, located in <a href=\"\" target=\"\" rel=\"\">Saudi Arabia,<\/a> <a href=\"\" target=\"\" rel=\"\">the UAE<\/a>, <a href=\"\" target=\"\" rel=\"\">Egypt<\/a>, <a href=\"\" target=\"\" rel=\"\">Qatar<\/a>, <a href=\"\" target=\"\" rel=\"\">Oman<\/a>, <a href=\"\" target=\"\" rel=\"\">Yemen<\/a>, and <a href=\"\" target=\"\" rel=\"\">Iraq<\/a>, in addition to its agents in China, Singapore, and other countries.<br\/>Having delivered over 7,000 feasibility studies, Mashroo3k has helped thousands of clients achieve their investment goals.<\/li><li>Mashroo3k&#8217;s services are accredited and trusted by all financial institutions and funding entities across the Middle East.<\/li><li>The company\u2019s geographic reach spans 35 countries across all continents.<\/li><li>Mashroo3k holds membership in over 100 prestigious international organizations specializing in market research and business management.<\/li><li>Its team consists of 350 consultants with deep expertise in promising economic sectors, ensuring tailored solutions and strategies that meet clients\u2019 needs.<\/li><li>Mashroo3k is partnered with more than 10,200 suppliers across 22 countries, providing logistical support for projects, including production lines, raw materials, machinery, and equipment.<\/li><li>With an extensive database, Mashroo3k enhances the accuracy of its forecasts and analyses, strengthening its risk management capabilities.<\/li><\/ul><\/div><\/div><\/div>\n\n\n<!-- Study Benifites -->\n<div class=\"content-card study-benifites tabs\">\n    <!-- Tabs Menu -->\n    <ul class=\"tabs-menu head\">\n                <li data-tab=\"tab-1\">Project Features<\/li>                <li data-tab=\"tab-2\">Study contents  <\/li>                <li data-tab=\"tab-3\">Sector indicators<\/li>                <li data-tab=\"tab-4\">The Project as an Investment Opportunity<\/li>    <\/ul>\n    <!-- Tabs Wraper -->\n    <div class=\"tabs-wraper\">\n        <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-1\">\n            <!-- Grid -->\n            <div class=\"row row-reverse\">\n                <!-- Media -->\n                <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/mashroo3k.com\/newweoryx\/wp-content\/uploads\/2023\/07\/Layer-1-82.jpg\" alt=\"\u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0642\u0637\u0627\u0639\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <article class=\"text-token-text-primary w-full\" dir=\"auto\" data-testid=\"conversation-turn-126\" data-scroll-anchor=\"true\">\r\n<div class=\"text-base my-auto mx-auto py-5 [--thread-content-margin:--spacing(4)] @[37rem]:[--thread-content-margin:--spacing(6)] @[72rem]:[--thread-content-margin:--spacing(16)] px-(--thread-content-margin)\">\r\n<div class=\"[--thread-content-max-width:32rem] @[34rem]:[--thread-content-max-width:40rem] @[64rem]:[--thread-content-max-width:48rem] mx-auto flex max-w-(--thread-content-max-width) flex-1 text-base gap-4 md:gap-5 lg:gap-6 group\/turn-messages focus-visible:outline-hidden\" tabindex=\"-1\">\r\n<div class=\"group\/conversation-turn relative flex w-full min-w-0 flex-col agent-turn\">\r\n<div class=\"relative flex-col gap-1 md:gap-3\">\r\n<div class=\"flex max-w-full flex-col grow\">\r\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"722ea68d-388b-4eaf-8fec-0d858fe41191\" data-message-model-slug=\"gpt-4o-mini\">\r\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\r\n<div class=\"markdown prose dark:prose-invert w-full break-words dark\">\r\n<ul data-start=\"0\" data-end=\"211\" data-is-last-node=\"\" data-is-only-node=\"\">\r\n<li class=\"\" data-start=\"0\" data-end=\"34\">\r\n<p class=\"\" data-start=\"2\" data-end=\"34\">Products of the highest quality.<\/p>\r\n<\/li>\r\n<li class=\"\" data-start=\"35\" data-end=\"79\">\r\n<p class=\"\" data-start=\"37\" data-end=\"79\">Application of approved quality standards.<\/p>\r\n<\/li>\r\n<li class=\"\" data-start=\"80\" data-end=\"126\">\r\n<p class=\"\" data-start=\"82\" data-end=\"126\">Compliance with approved health regulations.<\/p>\r\n<\/li>\r\n<li class=\"\" data-start=\"127\" data-end=\"211\">\r\n<p class=\"\" data-start=\"129\" data-end=\"211\">Management of developmental and marketing ideas to enhance competitive advantages.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<div class=\"flex justify-start\">\u00a0<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/article>\r\n<div class=\"pointer-events-none h-px w-px\" aria-hidden=\"true\" data-edge=\"true\">\u00a0<\/div>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-2\">\n            <!-- Grid -->\n            <div class=\"row\">\n                <!-- Content -->\n                <div class=\"col-12 col-m-6 rich-content\">\n                    <p><strong>Executive summary<\/strong><\/p>\r\n<ul>\r\n<li>About the project<\/li>\r\n<li>Financial indicators<\/li>\r\n<li>Justifications for establishing the project<\/li>\r\n<li>Government investment incentives in the project field<\/li>\r\n<li>Target markets<\/li>\r\n<li>Indicators and final results of the project<\/li>\r\n<\/ul>\r\n<p><strong>Study project services\/products<\/strong><\/p>\r\n<ul>\r\n<li>Project Description and All Its Products\/Services.<\/li>\r\n<li>Project Advantages and Production Requirements.<\/li>\r\n<\/ul>\r\n<p><strong>Market Size Analysis<\/strong><\/p>\r\n<ul>\r\n<li>Understanding Distribution Channels.<\/li>\r\n<li>Consumer Behavior, Preferences, and Habits.<\/li>\r\n<li>Competitors&#8217; Products or Services, and Their Strengths and Weaknesses.<\/li>\r\n<li>Market Nature and Characteristics.<\/li>\r\n<li>Demand Size for the Product or Service Offered.<\/li>\r\n<li>Available Market Share of the Target Market.<\/li>\r\n<li>The Optimal Marketing Method.<\/li>\r\n<\/ul>\r\n<p><strong>Risk Assessment<\/strong><\/p>\r\n<ul>\r\n<li>Risk Identification.<\/li>\r\n<li>Impact of Risks on the Project.<\/li>\r\n<li>Risk Mitigation Methods<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n                <!-- Content -->\n                <div class=\"col-12 col-m-6 rich-content\">\n                    <p><strong>Technical study<\/strong><\/p>\r\n<ul>\r\n<li>A detailed description of the project&#8217;s products, expected production capacity, and determination of investment costs.<\/li>\r\n<li>Determining the required electricity and water capacity.<\/li>\r\n<li>Determining the project&#8217;s labor requirements.<\/li>\r\n<li>Determining the project&#8217;s requirements.<\/li>\r\n<li>Calculating construction and building costs.<\/li>\r\n<li>Calculating the total capital<\/li>\r\n<li>Determining the annual operating costs.<\/li>\r\n<li>Determining the amount of working capital.<\/li>\r\n<\/ul>\r\n<p><strong>Financial study<\/strong><\/p>\r\n<ul>\r\n<li>Total investment costs required for the project.<\/li>\r\n<li>Organizing cash flow statements, income statements, and the balance sheet for the first ten years of operation.<\/li>\r\n<li>Determine the expected annual revenues of the project in light of the specified operational capacities<\/li>\r\n<li>The optimal financing structure for the project in light of investors&#8217; capabilities and financing conditions.<\/li>\r\n<li>The project&#8217;s financial indicators and sensitivity analysis.<\/li>\r\n<\/ul>\r\n<p><strong>Organizational and administrative study<\/strong><\/p>\r\n<ul>\r\n<li>Project workforce.<\/li>\r\n<li>Organizational structure.<\/li>\r\n<li>Job responsibilities.<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-3\">\n            <!-- Grid -->\n            <div class=\"row row-reverse\">\n                 <!-- Media -->\n                 <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/eg.mashroo3k.com\/wp-content\/uploads\/2021\/09\/\u0645\u0624\u0634\u0631\u0627\u062a-\u0627\u0644\u0642\u0637\u0627\u0639-1.jpg\" alt=\"\u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0643\u0641\u0631\u0635\u0629 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u064a\u0629\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <div class=\"flex-1 overflow-hidden @container\/thread\">\r\n<div class=\"h-full\">\r\n<div class=\"react-scroll-to-bottom--css-sgasq-79elbk h-full\">\r\n<div class=\"react-scroll-to-bottom--css-sgasq-1n7m0yu\">\r\n<div class=\"flex flex-col text-sm md:pb-9\">\r\n<article class=\"w-full scroll-mb-[var(--thread-trailing-height,150px)] text-token-text-primary focus-visible:outline-2 focus-visible:outline-offset-[-4px]\" dir=\"auto\" data-testid=\"conversation-turn-3\" data-scroll-anchor=\"true\">\r\n<div class=\"m-auto text-base py-[18px] px-3 md:px-4 w-full md:px-5 lg:px-4 xl:px-5\">\r\n<div class=\"mx-auto flex flex-1 gap-4 text-base md:gap-5 lg:gap-6 md:max-w-3xl lg:max-w-[40rem] xl:max-w-[48rem]\">\r\n<div class=\"group\/conversation-turn relative flex w-full min-w-0 flex-col agent-turn\">\r\n<div class=\"flex-col gap-1 md:gap-3\">\r\n<div class=\"flex max-w-full flex-col flex-grow\">\r\n<div class=\"min-h-8 text-message flex w-full flex-col items-end gap-2 whitespace-normal break-words text-start [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"7e323f42-8cb0-4259-9d65-7f3215f32e88\" data-message-model-slug=\"gpt-4o\">\r\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\r\n<div class=\"markdown prose w-full break-words dark:prose-invert dark\">\r\n<p>Given the importance of the sector, Mashroo3k presents below the key indicators for the construction sector in the GCC countries:<\/p>\r\n<h3><strong>Kingdom of Saudi Arabia (KSA):<\/strong><\/h3>\r\n<ul>\r\n<li>The construction and building sector\u2019s GDP value: <strong>168.75 billion SAR<\/strong>.<\/li>\r\n<li>Contribution of the sector to the GDP: <strong>4.66%<\/strong>.<\/li>\r\n<li>Number of companies operating in the sector: <strong>148,026 companies<\/strong>.<\/li>\r\n<li>Number of employees in the sector: <strong>3,541,977 individuals<\/strong>.<\/li>\r\n<li>Value of projects executed in the sector (latest statistics): <strong>311.56 billion SAR<\/strong>.<\/li>\r\n<li>Saudi Arabia leads the region as the largest contracting market, with an annual value exceeding <strong>$100 billion USD<\/strong>.<\/li>\r\n<\/ul>\r\n<h3><strong>United Arab Emirates (UAE):<\/strong><\/h3>\r\n<ul>\r\n<li>GDP value of the construction and building sector: <strong>123.953 billion AED<\/strong>.<\/li>\r\n<li>Sector\u2019s contribution to the GDP: <strong>8.3%<\/strong>.<\/li>\r\n<li>Number of companies operating in the sector: <strong>42,428 companies<\/strong>.<\/li>\r\n<li>Number of employees in the sector: <strong>1,564,095 individuals<\/strong>.<\/li>\r\n<\/ul>\r\n<h3><strong>Kingdom of Bahrain:<\/strong><\/h3>\r\n<ul>\r\n<li>GDP value of the construction and building sector: <strong>936.79 million BHD<\/strong>.<\/li>\r\n<li>Sector\u2019s contribution to the GDP: <strong>7.70%<\/strong>.<\/li>\r\n<li>In 2016, the sector&#8217;s value did not exceed <strong>857 million BHD<\/strong>, but it has grown over a few years to reach <strong>945.51 million BHD<\/strong>.<\/li>\r\n<\/ul>\r\n<h3><strong>Sultanate of Oman:<\/strong><\/h3>\r\n<ul>\r\n<li>GDP value of the sector: <strong>1.943 billion OMR<\/strong>.<\/li>\r\n<li>Sector\u2019s contribution to the GDP: <strong>6.7%<\/strong>.<\/li>\r\n<li>Number of employees in the sector: <strong>548,999 individuals<\/strong>.\r\n<ul>\r\n<li>The construction sector employs the highest percentage of workers in Oman, representing <strong>22.4%<\/strong> of Omanis in both the private and public sectors.<\/li>\r\n<li>It also employs <strong>29.6%<\/strong> of the total expatriate workforce in Oman.<\/li>\r\n<\/ul>\r\n<\/li>\r\n<\/ul>\r\n<h3><strong>Kuwait:<\/strong><\/h3>\r\n<ul>\r\n<li>GDP value of the construction and building sector: <strong>838.9 million KWD<\/strong>.<\/li>\r\n<li>Sector\u2019s contribution to the GDP: <strong>2.14%<\/strong>.<\/li>\r\n<li>Number of companies operating in the sector: <strong>1,502 companies<\/strong>.<\/li>\r\n<li>Number of employees in the sector: <strong>187,705 individuals<\/strong>.<\/li>\r\n<\/ul>\r\n<br \/>\r\n<h3><strong>Qatar:<\/strong><\/h3>\r\n<ul>\r\n<li>GDP value of the construction and building sector: <strong>81.215 billion QAR<\/strong>.<\/li>\r\n<li>Sector\u2019s contribution to the GDP: <strong>12.1%<\/strong>.<\/li>\r\n<li>Number of companies operating in the sector: <strong>5,629 companies<\/strong>.<\/li>\r\n<li>Number of employees in the sector: <strong>840,999 individuals<\/strong>.\r\n<ul>\r\n<li>The construction sector accounts for over <strong>40%<\/strong> of the total economically active adult population.<\/li>\r\n<\/ul>\r\n<\/li>\r\n<\/ul>\r\n<h3><strong>Global Construction and Building Sector:<\/strong><\/h3>\r\n<ul>\r\n<li>The construction and building sector is considered one of the most promising industries. Investment in this sector is expected to yield substantial returns due to population growth and infrastructure improvements.<\/li>\r\n<li>Experts forecast that the sector will grow at a rate of <strong>4.2%<\/strong> over the next three years. Market indicators suggest the value of the sector will increase to <strong>$10.5 trillion USD<\/strong> in 2023.<\/li>\r\n<li>In <strong>2020<\/strong>, the global construction output was estimated at <strong>$10.7 trillion USD<\/strong>, and it is expected to grow by <strong>42%<\/strong> (an additional <strong>$4.5 trillion USD<\/strong>) between <strong>2020 and 2030<\/strong>, reaching <strong>$15.2 trillion USD<\/strong> by the end of the decade.<\/li>\r\n<\/ul>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/article>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<div class=\"md:pt-0 dark:border-white\/20 md:border-transparent md:dark:border-transparent w-full\">\r\n<div>\r\n<div class=\"m-auto text-base px-3 md:px-4 w-full md:px-5 lg:px-4 xl:px-5\">\u00a0<\/div>\r\n<\/div>\r\n<\/div>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-4\">\n            <!-- Grid -->\n            <div class=\"row\">\n                <!-- Media -->\n                <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/eg.mashroo3k.com\/wp-content\/uploads\/2021\/09\/\u0627\u0644\u0641\u0631\u0635-\u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631\u064a\u0629.jpg\" alt=\"\u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <p>The construction sector contributes about 13% to the global GDP and this percentage is expected to rise to 13.5% by 2030. According to the statistics available to us, infrastructure will be at the top of the list of the fastest growing sub-sectors in the construction sector at a rate of 4% during the period (2020-2030).<\/p>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- \/\/ Tab Content -->\n    <\/div>\n    <!-- \/\/ Tabs Wraper -->\n<\/div>\n<!-- \/\/ Study Subjects -->\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":15114,"template":"","studies-categories":[43],"studies-tags":[],"yst_prominent_words":[],"class_list":["post-15113","studies","type-studies","status-publish","has-post-thumbnail","hentry","studies-categories-construction-and-building-sector"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/15113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies"}],"about":[{"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/types\/studies"}],"version-history":[{"count":3,"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/15113\/revisions"}],"predecessor-version":[{"id":15129,"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/15113\/revisions\/15129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/media\/15114"}],"wp:attachment":[{"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/media?parent=15113"}],"wp:term":[{"taxonomy":"studies-categories","embeddable":true,"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies-categories?post=15113"},{"taxonomy":"studies-tags","embeddable":true,"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies-tags?post=15113"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/eg.mashroo3k.com\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=15113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}